LDC MERI officer Marc McConnell

LDC welcomes new staff member Marc McConnell

Marc is the Monitoring and Evaluation (M&E) Officer for the LDC project and brings a wealth of experience with him. We asked him to provide a short bio to introduce himself:

Connecting sustainable agriculture with ecology is my great passion.

I grew up on a sheep station in Western NSW and being the middle child, there wasn’t a job too hot, too dusty or too unpleasant that I did not do. 

I have worked across Northern Australia with graziers trialling varied land management practices to help achieve a balance between carrying capacity, biomass and biodiversity.

Where I grew up, we faced the longest drought in living memory and this has instilled the importance of strong farming communities, shared innovation and resilience.

The evident successes and shared learnings achieved through the LDC project will have a long term impact and that’s something I’m really excited to be a part of. 

There are many opportunities for landholders to get involved with LDC, and I’m looking forward to meeting and working with BBB landholders and land managers. 

Contact Marc on ph: 0498 665 236, or email: marc.mcconnell@nqdrytropics.com.au.

 

Reef regulations - grazing, standard conditions

  1. For land in good or fair condition (more than 50 per cent ground cover at 30 September), continue using measures to maintain land condition.
  2. For land in poor condition (less than 50 per cent ground cover at 30 September), steps must be taken to improve land condition.
  3. For land in degraded condition (less than 20 per cent ground cover at 30 September), steps must be taken to improve land condition OR prevent areas from further degrading or expanding.
  4. Keep records of measures taken and also of agricultural chemicals, fertiliser and mill mud or mill ash applied to land.
KEQ #8

KEQ #7
KEQ #6

KEQ #5

KEQ #4

The LDC project monitors four gully sites (represented in this table) with gold standard equipment and analysis, carried out by CSIRO.

Results have been compiled in a preliminary report from Bartley et al (2020), with the final report expected to be released by the end of 2020. The preliminary report shows all four sites have indicators of improvements, notably the Strathbogie and Mt Wickham sites.

KEQ #3

*The Exploring New Incentives activity area has provided an opportunity for graziers to adopt improved land management practices through a range of activities. For some of these properties, it was the first time they signed contracts for on-ground works.

KEQ #1

Figure 1. Total fine sediment reduction by project type and erosion source. Inset shows the proportion of the total project area for each project type.

These estimates have been calculated using two methods: 

1) The pollutant reduction component of the Alluvium/Great Barrier Reef Foundation (GBRF) investment tool for hillslope and streambank erosion management projects; 

2) The Reef Trust Gully Toolbox method for gully erosion management projects. The LDC Water Quality Report 2020 (Waterhouse et al., 2020) highlights that a number of assumptions underlay these calculations, therefore these figures should be treated as the best available estimate of sediment reductions to date.

Preventing sediment from reaching the Great Barrier Reef

Each wet season sediment is washed into local waterways and out to the Great Barrier Reef (GBR). 

Most sediment is very fine, and can stay suspended for a long time and can travel great distances. Valuable topsoil is lost from production, and increased concentrations on the reef can be harmful to seagrasses and corals. 

Landholders in the BBB have completed 69 on-ground water quality practice changes, and it is estimated that these have contributed a fine sediment reduction of 6,154 tonnes per year from reaching the GBR. 

Of this, approximately half of the sediment savings are attributable to grazing land management changes on hillslopes and streambanks, and the other half as a result of gully remediation treatments across a broad range of scales, as shown in the graphs above. 

The table below also highlights the relatively small area of intervention in the gully management projects compared to the large sediment savings that these can achieve - 60 per cent of the sediment savings over only 4 per cent of the project area.

Table 1. Estimated sediment reductions (tonnes) from projects completed in the LDC Project to date.

KEQ #2

*GLMWW = Grazing Land Management Wire and Water

Published by four titlesCirculation - 8,780

Published by four titlesCirculation - 8,780

Published by four titlesCirculation - 8, 780

 

Published by two titlesCirculation - 4,006

Published by four titlesCirculation - 8,780

 

 

 

 

Published by one titleCirculation - 7,207

 

 

 

Published by two titlesCirculation - 9,965

 

 

 

Published in The Northern MinerCirculation - 2,041